The Project

ElecMech carried out the complete strip‑out and refurbishment of the third and fourth floors to create a bespoke drone lab and IT teaching space.

Scope Included:

  • Full strip‑out of two open‑plan floors
  • New containment, conduits, galvanised trunking and exposed pipework
  • Small power in trunking and lab spaces via pathfinder systems
  • Lighting upgrades with retrofitted edge‑lit fittings integrated into existing chilled beams
  • Lutron lighting control
  • Tea points with Zip taps
  • Chilled water system alterations and full rebalancing

The outcome

Delivered on 12 week programme and on budget, with excellent feedback from the university.

Building 32

Building 54

This project was an 11-story building to be refurbished on a semi temporary basis as the building is due to be demolition in the next 5 years.

This was carried out in two phases; Phase 1 was carried out over the summer period and run concurrently with building 32.

We stripped out all 11 floors core staircase lighting, rewired and re installed new LED lighting through the entire core.

In addition to the stairs, phase 1 saw the refurbishment of floors two, three and four both small power, lighting and level 3 toilet refurbishment.