Bluewater

Sub Distribution HV/LV

Project Overview

ElecMech were engaged to carry out the installation of a 1600A LV panel delivered in 5 sections, from kerbside delivery, site conditions were assessed and our team overcome various obstacles to get the panel into position, once in position the panels are aligned and the outer sections are bolted together to form one large panel, then our internal works commence with the link of the busbars and earth bars, wiring of the sub meters to the associated MCCB's are caried out. 

MCCB placement within the panel as per the Schematics are undertaken with witnessed torquing at every stage of the build. 

We test and commission at critical stages of the build before sensitive components are installed and added to the build.

Services Used:

  • Lift and shift (kerbside)
  • Panel placement assembly
  • Busbar alignment and connections
  • Critical testing
  • Sub metering wiring and testing
  • ACB installation 
  • MCCB installation 
  • Commissioning and testing